How to install efficient eddy current separator?

The author:Yancheng Jishengda Environmental Protection Engineering Co., LTD Click:1281  Date of Issue:2021-11-15

First, the preparation work before installation

1. Check whether all parts of the equipment are complete according to the delivery list.

2. Prepare all kinds of tools for equipment installation, such as lifting tools, oxygen, acetylene, welding machine, etc.

3. Prepare all kinds of materials needed for installation, such as steel plate, 20 # channel steel, non-standard fan pipe, etc.

Two, the installation of equipment

(1) Basic arrangement of equipment

1, for the new equipment, or open mill to closed mill, according to the process layout, equipment shape size for basic wiring. If the concrete foundation is used, the steel plate should be embedded according to the size of the equipment. To save costs, steel supports can also be used to lay the foundation of the equipment.

2. For the transformation of closed-circuit mill, after removing the original centrifugal powder separator and double-rotor powder separator, the T-SEPAx high-efficiency eddy current powder separator can be directly arranged in the original base position. Due to the large size of the hole reserved for the installation of the original equipment, it is directly combined with 20 # channel steel to make the "well" frame as the foundation. The square side length of the "well" frame is the diameter of the shell at the inlet position of the T-SEPAx efficient eddy current separator.

Sometimes, the transformation of centrifugal powder separator will encounter the problem of insufficient plant height. Because of the small size of the T-SEPAx efficient eddy current separator, the T-SEPAx efficient eddy current separator can be directly installed in the reserved hole, with steel support as the foundation.

(2) Installation steps

1. Bolt connection between the lower inlet shell of the T-SEPAx efficient eddy current separator and the lower coarse powder cone, pay attention to the position of the three eyes, and do a good job of sealing lifting on the "well" frame with asbestos rope, and fix the flange part of the lower cone with four supporting feet. Ensure that the large flange of the lower cone is basically level. The four support feet are not welded to the "well" frame.

Note: (1) The air inlet should be clockwise; Align the air inlet with the fan port.

2. Place the air guide cone and medium coarse powder pipe in the air inlet shell, otherwise the main machine cannot be installed after being installed.

Note: the small head of the air cone is on the top, and the medium coarse powder pipe passes through the air cone. Easy to install below.

3. Lift the main machine of THE T-SEPAx efficient eddy current classifier, and connect it with the bolt of the lower air inlet shell, pay attention to the three-eye position, and seal it with asbestos rope.

The host part of t-SEPAX high-efficiency powder separator above TS1000 needs to be installed on site due to the restriction of transportation height.

4. When lifting the four cyclone cylinders of T-SEPAX efficient eddy current classifier, it shall be sealed with asbestos rope when bolted to the four air outlets of the host machine.

Note: the serial number of the cyclone barrel should be consistent with the serial number of the four air outlets of the main engine.

5. After the main machine is installed, check with the level instrument, and the horizontal error of the main shaft belt plate is not more than 2/1000. Then the four supporting feet of the powder selecting machine are welded in the "well" frame.

6, the installation of four cyclone barrel single hammer flap valve and the lower cone cone double hammer flap valve.

7, the production of a small cone about 0.5 tons, cone large plane and four cyclone tube is connected with the slip pipe, the Angle between the slip pipe and the horizontal plane shall not be less than 45°. The small end of the cone is connected with the conveying equipment, and the finished products are stored.

8. The double hammer flap valve is connected with the conveying equipment with the slip pipe to send the coarse powder to the grinding head. The included Angle between the pipe and the horizontal plane shall not be less than 45°.

9. Make the fan foundation with 20 # channel steel, and arrange the damping pad evenly under the fan foundation, and place the fan and motor on the foundation.

10. The air inlet pipe of the powder selecting machine must be sealed with asbestos rope between the pipe flanges. The plane under the air inlet of the powder classifier and the plane under the air outlet of the fan must be on a horizontal plane.

Note: the shock cushion of the fan must be arranged horizontally.

11. Lift two wind bifurcation pipes, which shall be sealed with asbestos rope when connected with bolt of cyclone tube.

Note: Air bifurcation pipe is connected with cyclone barrel according to serial number.

12. Connect the three air ducts.

13. Make and install fan pipes. The elbow of the air duct shall not be greater than 90°, and the length of the air duct shall be arranged as short as possible to avoid large pressure loss. (Note: before installing the pipe, mark the "on" and "off" direction of the breeze valve on the pipe)

14. Lift the spindle motor and install the spindle triangle belt. Make sure the triangle has some tension.

15. Before the air outlet of the fan and the air inlet of the host are not connected, enter the inside of the powder separator and install the air guide cone and medium coarse powder pipe.

When installing the air guide cone, the small head plane of the air guide cone is required to be 50 ~ 60mm higher than the plane under the air inlet of the classifier, and the air guide cone is supported by Angle steel.

When installing medium coarse powder pipeline, it is required that the medium coarse powder pipeline should be as close to the spreading plate as possible, and the lower vertical flange of the spreading plate should coincide as far as possible. The principle is not to interfere with the medium coarse powder pipeline when the spreading material rotates, and the medium coarse powder pipeline should be supported by Angle steel.

16. Support the cyclone barrel and the host machine with channel steel.

17. Install the electrical circuit of the equipment.

18. Gas station where the main shaft of the powder selecting machine is installed. The principle is to facilitate refueling when the powder selecting machine is in normal operation.

Previous:Do you know the structure characteristics of pulse single machine dust collector?
Next:The standard on which dust removers are designed
  • HOME  |   ABOUT ?。 ?a href="/english/index.php/List/index/cid/83.html" >PRODUCT ?。 ?a href="/english/index.php/List/index/cid/140.html" >Case  |  News ?。 ?a href="/english/index.php/List/index/cid/261.html" >Question  |  Message ?。 ?a href="/english/index.php/List/index/cid/311.html" >Contact ?。 ?
  • 亚洲人妻无码在线视频,91久久久久无码精品国产,最新热久久99这里有精品,国产激情九九九九老熟女,欧美一区国产二区,久久精品网站免费观看,久久一本岛在免费线观看2020,中文字幕av网最新资源站 亚太影院 柯西贝尔-游戏赚网
    无码五月天国产原创| 日韩精品秘 一区二区三区| 日韩专区无码专区| 精品蜜臀国产AⅤ一区二区三区| 亚洲中文无码手机亚洲| 国产欧美亚洲精品第1页| 中文字幕一本精品在线| 国产自产精品欧美| 国产精品亚洲专区无码第一页| 久久免费网国产AⅤ| 中文字幕人成乱码熟女免费69| 欧美亚洲中文精品三区| 97人妻免费视频公开| 亚洲中文字幕在线资源第1页| 亚洲日韩乱码人人爽人人澡人人| 国产又粗又猛又大爽色婷婷| 欧美伊人色综合久久| 亚洲人成人无码网在线观看| 美女自慰网站国产| 制服丝袜人妻无码每日更新| 国产爆乳无码视频在线| 亚洲中文精品在线观看| 国产无码三级片精品网址| 无码国产精品一区二区虚拟VR| 中文字幕无码dvd亚洲| 在线亚洲 欧美 日本专区| 亚洲无码免费在线小视频| 国产一级 片内射免费视频| 欧美一级婬片人妻欧美大片| 中文字幕无码欧洲| 免费一级a一片一久久| 国产女同久久精品国产99| 精品久久香蕉国产线看观看gif| 亚洲精品无码视频在线专区| 欧美日韩亚洲麻豆| 人妻无码少妇一区二区三区| 国产精品福利在线观电影看| 手机观看的国产精品无码| 亚洲国产精品久久久久秋霞| 99视频在线观看精品29| 99精品全国免费|