PRODUCT

contact
Technical Consultation139-6208-6422

Yancheng Jishengda Environmental Protection Engineering Co., LTD

Address:18 Wenjing Road, Beijiang Industrial Park, Yancheng City, Jiangsu Province

Contacts:Mr Li

Mobile phone:13962086422 

Telephone:0515-88858716

Fax:0515-88858726

    0515-88669778

Email:ycjsd888@sohu.com

News
Current Position:HOME>>News

Does environmental protection equipment dust collector need to do external insulation?

The author:Yancheng Jishengda Environmental Protection Engineering Co., LTD Click:1338  Date of Issue:2021-11-22

Does environmental protection equipment dust collector need to do insulation? Surely many users have this question, today feng Earth environmental protection xiaofeng answer for you! And why do you make insulation? Actually in the insulation system of dust collector, pipeline and dust removal equipment installation of insulation is a good dust removal equipment, in order to cover the purpose on the one hand is to prevent gas condensation, condensation in a system, the corruption of the material and powder agglomeration effect of powder transport, on the other hand is heat insulation and sound insulation effect, can reduce the effects of dust removal equipment of the outside world and nuisance.

Therefore, the dust removal system of pipes and equipment must do external heat preservation, especially in areas with large temperature differences and working conditions, as for the degree of heat preservation, mainly depends on the temperature and composition of flue gas, pipeline and dust removal equipment production material, as well as other restrictions on the dust removal system.

So what's the right way to keep it warm?

1, bag dust collector insulation layer thickness is generally 100MM, each reinforcement is 50MM, thermal insulation material selection of high temperature glass wool (TYPE1000, δ=50), in the thickness of two layers of laying, layer should be staggered, staggered interval is not less than a third of the length or width of the plate, spelling should be precise leveling, The outer layer of high temperature glass wool should be laid with galvanized hexagon iron tribulus, and then pressed with self-locking gaskets. A steel plate net is laid at the small ash hopper under the ash hopper of pulse bag type dust collector, and then pressed by a self-locking gasket.

2, the insulation layer should be waterproof, fire prevention, thermal insulation group plane smooth elegant (after thermal insulation plane but leakage reinforcement, reinforcement and outer protection plate flush, the outer layer of the atmosphere activity layer insulation layout) does not affect the use of dust accessories.

3. The insulation layout requires the deployment of self-locking gaskets at least 8 per square meter, and the degree of pulling core aluminum rivets is biased to the spacing of 200MM. Used in any climate, so the laying of the shell screen is conducive to drainage. Guard against damage to dust bag. The layout requires no less than 8 self-locking gaskets per square meter, and the degree of core-pulling aluminum rivets is biased to the spacing of 200MM.

4. The joints of the inner layer of the insulation surface shall be staggered, and there shall be no holes between the layers and the joints. The insulation density shall ensure that the density of the insulation shall not collapse in the permanent operation. In order to guarantee the uniform appearance of the outer property of the metal shield layer, the metal skeleton should be properly set up to support the metal shield layer. The thermal insulation material is made of high temperature glass wool with a bulk density of 32 kg per cubic meter.

5, the insulation material must be satisfied with the insulation performance, guarantee the insulation (the temperature is not higher than 25 degrees, the external temperature of the insulation layout is not above 50 degrees; When the ambient temperature is higher than 25 ° C, the external temperature of the thermal insulation layout is 25 ° C higher than the ambient temperature. Thermal insulation layout in the planned use of life should guarantee complete, in the process of use is not allowed to appear burned out, corruption, peeling signs. Insulation layout should be sufficient machine strength, in the dead weight, vibration, wind and snow under the action of additional loads will not be destroyed.

Previous:first
Next:How should PPC air box pulse dust collector keep heat
  • HOME ?。 ? ABOUT ?。 ?a href="/english/index.php/List/index/cid/83.html" >PRODUCT ?。 ?a href="/english/index.php/List/index/cid/140.html" >Case  |  News ?。 ?a href="/english/index.php/List/index/cid/261.html" >Question  |  Message ?。 ?a href="/english/index.php/List/index/cid/311.html" >Contact ?。 ?
  • 亚洲人妻无码在线视频,91久久久久无码精品国产,最新热久久99这里有精品,国产激情九九九九老熟女,欧美一区国产二区,久久精品网站免费观看,久久一本岛在免费线观看2020,中文字幕av网最新资源站 亚太影院 柯西贝尔-游戏赚网
    免费国产成人aⅴ在线观看| 久久久久国色a∨免费看| 亚洲私人无码内射精品观看| 免费看国产夜色视频| 露脸国产精品自产在线播| av无码中文字幕不卡一区二区三区| 老女乱中文字幕熟女熟妇| 亚洲.国产.一区二区三区| 亚洲日韩Av中文字幕无码| 精品国产国语对白久久免费| 大伊人无码综合天堂Av| 手机在线观看av片不卡| 亚洲av第一区国产精品| 国产成人99精品免费视频| 一级无码中文字幕在线| 久久人人97超碰国产公开| av中文字幕一区二区| 精品亚洲中文字幕东京热网站| 在线观看视频一区精品视频| 精品少妇熟女av免费久久| 日本一二区中文字幕在线| 97超视频国产免费| 亚洲制服丝袜中文字幕自拍| 亚洲日韩欧美少妇精品| 三级 精品 无码 不卡| 亚洲色一色鲁一鲁鲁| 国产精品人人做人人爽人人添| 亚洲国产精品无码久久青草| 亚洲中文字幕无码永久免弗首页| 精品国语人妻色乱码二区| 婷婷婷国产在线视频| 福利日韩精品中文字幕专区| 日韩精品久久久久久久电影| 亚洲av无码一区东京热| 人妻中文专区字幕| 国产在线一区二区在线视频| 国产亚洲成AⅤ人片在线观看嫩草| 中文字幕无码视频摸| 在线国产欧美精品123| 最新无码国产在线视频走光| 午夜片无码区在线观看视频|